20.Our packing is savable.

Packing by Ocean
.JPG)

21.Could I only purchase the LED lamp form you for our replace project?
Yes,welcome! Please kindly inform me the visual size of your light box.Then I would offer the best suggestion for you.
22.How to change the LED lamp?
It is easy.Please kindly check for the Operator Manual as following:

23.How to change the poster?
Q: I received the ED-F8-A3 light box this morning. Thank you so much for your excellent quick service. I am very, very pleased with it! It is stunning! The only question I have is how do you open it to replace the picture? Please tell me how. Do I use a screwdriver? How does it open up?
A: That is such good news!I am so happy that you like the sample.^0^
ED-F8 is four sides snap open,it is very easy to change the poster,no need the screwdriver.
please kindly click here, I am sure you would found out how to change the poster at once.
24.Edlite is welcome any client purchase the frames and LED lamps strips and accessories from us.
Q: We are a signage manufacturing company based at Bangalore having our own fabricating facility, we have clients whose requirements are various sizes, Is it possible for us to import the frames and accessories separately and do the final sizing at our factory. We can import in good quantity. Kindly let us know the possibility.
A: Welcome to purchase the aluminum frame and accessories form our factory and assemble by yourself.
The mothod would reduce so much freight fee.
Please kindly inform me the types(lamp source,single sided or double sided) and sizes(external size | visual size | poster size)? you would like,then I would suggest the best code for you.
By the way,,I strong recommend you purchase a sample at first.
Then you could look into the detail,and make sure is it easy for you to assemble.
25.Welcome to purchase the EEFL lamp only from us.
Q: We would like information, including pricing, of your EEFL Splim Light Box. If possible, include shipping cost to Australia City.
Also, please let us know if you can sell us only the EEFL lamps.
A: Welcome to purchase any EEFL lamps to test at first.
And please kindly inform me the visual size ,thickness of your light box.Then I would offer the best suggestion for you.
26.Wire of transformer
Q:How long is the wires?
A:The wires could divide into three parts, total lenght is approximately 10 feet long.
The part A (Fixed lenght) is about 0.39 inch,the part B (Fixed lenght) is 6.56 inch,part C (Fixed lenght) is 4.9 inch.
Please kindly confirm the detail of the wires.

27.Poster change
Q:Hello Jenny,I received the ED-F8-A3 light box this morning. Thank you so much for your excellent quick service. I am very, very pleased with it! It is stunning! The only question I have is how do you open it to replace the picture? Please tell me how. Do I use a screwdriver? How does it open up?
A:That is such good news!I am so happy that you like the sample.^0^ ED-F8 is four sides snap open,it is very easy to change the poster,no need the screwdriver.
Alan,please kindly check for the snap open picture.
I am sure you would found out how to change the poster at once.
28 Q:Please let me know when its going to be the Chinese Export Commodities Fair i truly want to be there. In other hand, i want to know if you can recomend me a 4 or 5 star hotel near from you ( I need the phone number or email addres ) so i can do me reservations.
i′m going to hong kong and then to Guanzhou, please tell me what way do you think is the best to go to your city? ( Train, Airplan, road ) do you know how much it cost me a ticket fron hong kong to your city ?
A:Sir,welcome to visit our factory.
From HongKong to guangzhou,bus is the best way,it is about 3.5
hours.Payment is about 220~250 HKD(Hongkong airport to Guangzhou Urban
district,the bus is "中旅").Form 7:00 ~ 22:00.60 mins a turn.And some
terns could arrivel on the gate of Hotel Landmark Canton"华厦大酒店 "(The
hotel I would refer on the following) .
For the Chinese Export Commodities Fair would be hold form 15,Oct to 6th,Nov.
There are three Phases.
Phase 1 is 15,Oct~19,Oct
Phase 2 is 24,Oct~28,Oct
Phase 3 is 2,Nov~6,Nov
They would show the different products.
Moretail,please kindly enter the
website:http://www.cantonfair.org.cn/en/index.asp.
For the hetel,Daniel,there are two choices for you:
(1)The Hotel Landmark Canton (4 Star)华厦大酒店
It is near by subway,it is easy go to everywhere,as well as our factory.
Hotel Landmark Canton(4 star)
Add:Qiao Guang Road, Haizhu Square, Guangzhou 510115, P.R.of China.
中国广州市侨光路 8 号
Tel:(8620)83355988 Fax:(8620)83336197
E-mail:bc@hotel-landmark.com.cn
http://www.hotel-landmark.com.cn
http://www.cantonfair.org.cn/en/service/hotel/landmark/index.asp?HotelId=18
Hong Kong Reservations Centre
Room1406, Hermes Commercial Centre, 4-4A Hillwood Road, TST, Kowloon, HongKong
Tel: (852)2730 8309,2730 9345 Fax: (852)2730 8456
Convenient Services:
Complimentary frequent shuttle bus between Hotel and Trade Fair Centre.
Complimentary shuttle bus between Hotel and Tianhe Express Train Station.
Canton Fair Buyers' Registration Section Desk is specially set up
at Hotel Lobby
Free use of indoor swimming pool & health center which is newly
well-equipped
Complimentary 30 TV channels for entertainment
24 hours service at Business Center
Free in room high-speed Broadband internet for browsing
Payment:
On the Chinese Export Commodities Fair period,the payment is
increase,from 450 RMB to 1900~2000 RMB per night.
(2)The Panyu Hotel(4 star)番禺宾馆
In the Suburb ,but near by our factory,and near the subway(MTR),easy
to go the everywhere.
Add: No.130, Dabei Road, Shiqiao, Panyu
District, Guangzhou, P.R.C.
中国广州市番禺区市桥大北路130号
Tel: 86-20-84822127
Fax: 86-20-84838268
E-mail: photel@public.guangzhou.gd.cn
Website:http://www.panyuhotel.com
http://www.cantonfair.org.cn/en/service/hotel/panyuHotel/index.asp?HotelId=2
Convenient Services:
Overseas Buyers'Registration Section inside hotel lobby
Free shuttle bus to/from Pazhou complex; free daily buffet breakfast
Free safety box in the front office and in room
Free broadband internet connection in room
No.7 Airport Express bus to/from Guangzhou Airport, please find bus
just outside of arrival hall
8 minutes by walk to MTR (Subway)
Ticketing: selling bus and ferry tickets to Hongkong and Macao;
selling airline & railway tickets; air ticket confirmation etc.
18 hours business centre service: Internet, E-mail, English
Translation & Interpretation, Scanning, Fax etc.
24-hour room service
Panyu China Travel Service inside the hotel transacts various package
tours. Car rental service available.
Payment:
On the Fair Time it is about 980~1950 RMB.
Daniel,for the hotel you could clip into the website for more choices:
http://www.cantonfair.org.cn/en/attend/registration/index2.shtml
Tips:
1.The tax of guangzhou would add 1 RMB as Bunker Surcharge or Bunker Adjustment.
2.Buyers should register for Buyer Cards before entering the Chinese
Export Commodities Fair Complex.
Buyer Card is valid admission to the Fair at both complexes. Please
keep it well as exhibitors will not bargain with visitors without the
Buyer Cards.
You could purchase the Buyer Cards from Canton Fair Buyers'
Registration Section Desk of the Hotel Lobby (The two hotel I refered
above have the service) .
3.The two hotels have the free bus go to the Chinese Export Commodities Fair.
4.Danel,as you would stay on guangzhou in several days,you could
purchase the local cell card(手机芯片卡和话费卡) to reduce the cell payment.
29 Q:.Hi Jenny, I'm interested in your slim light box, especially the one with cooling system.
I had some bad experience regarding the life of slim light box, that the brightness deteriorates in less than 3 months time, and a lot of my customers' been complaining about it.
Could you give me some explanation regarding your cooling system, and also the price list of your products?
A:Thank you for you instrest in Edlite slim light box.
Andrias,for the life of the slim light box,it is mostly refered to the temperature.
The life of LED slim ligh box is means the working period of LED slim ligh box,until the brightness is degradation as 50% of the initial data(half period).And mostly important,the temperature of the LED lamp/Bulb which is inside of LED slim light box would be very high,sometimes it would be up to 85℃.The high temperature would be serious degradation the brightness/Lumen of LED lamp/bulb inside of the LED slim light box.
High temperature,low life-span.....
Andrias,for our cooling system,use the special cooling ventilation system and special power supply.The heat of the LED lamp could be out by the aluminium PCB(Special),and the aluminium PCB is output the heat from the frame aluminium(Special),then when you try to touch the slim light box,you would found the aluminium frame is heat.As the heat is output to the aluminium frame.
And for the different size,our cooling design would be a little different.
I strong recommend you purchase a sample to test at first.
30.Q:Please offer the spec. of the fluorescent lamp
A:
T4/T5 fluorescent lamp & Bracket |
| Spec. |
Lenght(Add bracket) |
Spec. |
Lenght(Add bracket) |
Spec. |
Lenght(Add bracket) |
Spec. |
Lenght(add bracket) |
| T4-5W-234mm |
258mm |
T4-18W-509mm |
533mm |
T4-28W-1149mm |
1173mm |
T5-28W-1149mm |
1173mm |
| T4-8W-317mm |
317mm |
T4-22W-713mm |
737mm |
T5-8W-288mm |
312mm |
T5-35W-1449mm |
1473mm |
| T4-12W-419mm |
443mm |
T4-24W-849mm |
873mm |
T5-14W-549mm |
573mm |
|
|
| T4-16W-464mm |
488mm |
T4-26W-1000mm |
1024mm |
T5-21W-849mm |
873mm |
|
|
| Remark:T5 lamp is more widely use than T4 lamp. |
| |
|
|
|
|
|
|
|
|
31.Q:Why you seems like Hongkong company,but your factory is in Guangzhou,not in Hongkong?
A:Actually,we are both the Hongkong company and Guangzhou company.We was registered as Guangzhou company(the company name is in chinese )at first.But as our aim is the obroad markeing .So we registered as "Edlite Company Limited" on Hongkong as well,it would be more convenientt for our obroad marketing.
And our boss is Hong Kee ,he has another company(Kanghong ) in Hongkong.The company could offer the base service for our clients as well.So we show the contact detail in the website.
32.Q:We are very instrest in Edlite slim light box,could you send soem samples of each model in small size (A4) sent by DHL?
A:Sir,for sample,we could offer,but not free.The sample fee could be return when you place the 1st order in bulk.
33.Q:Could you offer a letter from your company to appoint us as your authorised distributor for our country ?
A:That would be OK.But sir,we would only offer when your market was large,and the amount is large.
34.Q:Could you offer the service support and training for LED's and the light boxes in our country. How do you plan?This is very important to understand the after sales service because our customers will want this.
A:Sir,you could take some workers to our factory to train for a period.But it is after you become our authorised distributor.
35.Q:Could your catalogues and art work including our name?
A:It is not problem the art work including your name.But the actalogues,it would be including your name after you become our authorised distributor.
36.Q:Could you offer discount on the last prices you sent us? We request you to consider 15% on the last prices. (We have to pay import customs duty of 19% on the CIF price and then this makes the net cost very high for the customer as compared to the conventional Light box with FLS tube).
A:Sir,for the custom duty,we could try to low for you.It just need the low value in the commercial invoice,if low value at 50% in the commercial invoice,you could reduce 50% custom duty.In another words,you could reduce 9.5% custom duty.For the price,for your order in bulk,we would try for the best discount for you,but it is refered to the qty.
37.Q:Could I drill he holes ourself?
A:Paul,please kindly inform me which sides would you like to drill the holes.
If it is short sided,it is OK.
But if it is in the two long sided,it would be better we drill the holes for you.
As the LED strips in put in the two long sided.If you drill any holes in the two long sided by yourself,it would very easy to broken the LED strips.Please kindly inform the detail of the holes you request,then we would drill by you.
If you try to drill by yourself,and damage the LED strips already,there is only one way to deal with:
Disassemble the led light box,and cut the LED strips as several parts,connet the LED strip parts by wires.Make them far form the holes.
Remark:For DC-12V,3 pcs LEDs as one set/ unit ;For DC-24V,6 pcs LEDs as one set/unit.Cutiing is refer to set/ unit.
38.Q:Is the lightbox good for in and outdoor?
A:Monika,most design of Edlite light box is only suit for indoor.
Only some codes (ED-S7 and ED-SH / ED-DSH) could be outdoor use.
39.Q:I can’t see what is holding the graphic/poster in place.ED-FM & ED-S7: graphic fix to the face panel by ….what? Magnetic clamp? Double sided tape?
ED-S6 : how can customer change graphic frequently?Please advise.
A:The ED-FM is flip open,not need any Double Faced Adhesive Tape ;
ED-S6 is fix by Double Faced Adhesive Tape on the light panel.It is easy to change as well.
ED-S7 is fix by the magnet strip in the face panel,please kindly check for the drawing as following:

40.Q:Could you offer for 9 LED lightpanels, complete like LED lightboxes but without the alu frame around,only 1 wire outgoing?
A:There are several design for the LED panel.
(1)With the L shape aluminium profile in the two long sides which is mount the LED strips;
(2)Without any aluminium profile,the LED strip is mount by the lamp panel,same as the common LED light box;
(3)Without any aluminium profile,but the LED strip is mount in the acrylic groove,similar as the crystal light box.
| (1) |
|
 |
| (2) |
|
|
| (3) |
|
|
41..Q:Can you guys provide us spec of slim light box?
A:No problem.Pls check for the specification of Edlite LED light box as following:
Item |
Description |
Code |
ED-F8 (Flip-open) 24 H x30 Wx0.59” D/ 610x762x15mm |
ED-F9 (Flip-open) 32.5 Hx38 W x0.79” D/ 826x965x20mm |
Sided |
Single sided |
Thickness |
15mm / 0.59” |
20mm / 0.79” |
Frame width |
20mm / 0.79 ” |
25mm / 0.98 ” |
Available size |
A1,A2,A3,A4,Custom size |
A0,A1,A2,A3,A4,Custom size |
Max size |
730 x 1630 mm / 28.7” x 64.2” |
930 x 2030 mm / 36.6” x 79.9” |
Net Weight |
6.2KG |
10.5KG |
Housing |
Aluminum frame, frosted finish |
Fixture Connections |
Integral mail/female connectors,5.56 ‘ / 2M form the light box to the transformer,4.9’ / 1.5M form the adapter to plug |
Operating Temperature |
-4°F~122°F(-20℃~50℃) Remark: the color temperature would be a little change in different temperature |
Humidity |
0~95%,non-condensing |
Certification |
UL,CE |
Environment |
Dry Location,IP20 |
Voltage |
Output Voltage:12V DC; Input Voltage: 110/120/230/240VAC |
LED |
SMD,Class 2 LED, 20mA, 0.06W,mixing distance:0.39” /10mm |
SMD, Class 2 LED, 0.06W / 0.5 W, mixing distance:0.24” /6mm |
Transformer |
DC-12V,2A,size:4.73x2.17”x1.38”/ 120x55x35mm |
DC-12V,5A,size:4.53x2.49x1.5”/ 115x63x38mm |
Lumens+ |
246(6000K),222(7200K) |
625(6000K),562.5(7200K) |
Color Temperature |
6000K(+375/-300) to 7200K(+400/-500) |
Efficacy(Lm/W) |
20.5(6000K),18.5(7200K) |
25(6000K),22.5(7200K) |
Lumen Maintenance |
27,000 hours L70≠@25℃,40,000 hours L90≠@25℃ |
18,000 hours L70≠@50℃,32,000 hours L90≠@50℃ |
Power Consumption |
12W maximum at full output, steady state |
25W maximum at full output, steady state |
42.Q:I would like to know the quality of LED:
1. What brand of LED are you using? Cree, Osram, Nichia, Philips? Can you use Cree LEDs.
2. What is the warranty? 12months, 24months
3. How ling will the LEDs last for?
A:Thank you for your further inquiry.
For the LED lamp,we choice the HongLi.Warranty is 24 months.Lumen Maintenance:27,000 hours L70≠@25℃,40,000 hours L90≠@25℃
Hok,if you would like other LEDs,the cost would be different.Maybe you could purchase the LED lamps,then we assemble for you.
43.Q:Is there a difference in quality/brightness between engraved Lightpanels and silk printing Lightpanels? Or what would be the difference?
A:The brightness of the engraved LED panel would be more equally.But the engraved LED panel would waste more material.